ASAHI Corporation is a Designing and manufacturing accessories for video and audio

株式会社アサヒ

TOP >> Reliability Evaluationt / Facilities & Equipments


Reliability Evaluation / Facilities & Equipments

Simulation and Analysis of the strength & material flow
for the injection molding parts by 3D CAD.
Make the parts by 3D printer and evaluate it at
design stage.
At the molded parts trial, evaluate it again from
various angles.
Layout the necessary process and equipments at
the mass production.
And examine the environment controlled elements
in-house.
Full inspection may be conducted, if necessary.